November 12, 2026
If you tour a new home off N.C. 5 in Aberdeen this fall, you'll get there on a road that is being rebuilt. NCDOT plans to divide about 3.3 miles of N.C. 5, from U.S. 1 to Whitney Drive, with a center island. Left turns will be limited, and U-turn "bulbs" will handle trips across the road. The left turn you make out of a model-home parking lot today may not be possible from the same driveway once the work is finished.
Aberdeen's planned growth sits mostly along two highways, N.C. 5 and U.S. 15-501, and both are in the same state improvement program. On these corridors, how a subdivision connects to traffic is being decided by state engineers and the Aberdeen Town Board, and those decisions are changing which homes get built and where their entrances go. Buyers comparing Sandhills towns usually start with price per square foot. In Aberdeen, the first thing to check is the route out to the highway.
NCDOT's U.S. 1/15-501 and N.C. 5 Improvements project covers three highways and is funded at $274 million. NCDOT says segments that now have a two-way center turn lane will mostly lose it, replaced by a raised median and "reduced conflict intersections." The N.C. 5 piece, from U.S. 1 in Aberdeen to Trotter Drive and Blake Boulevard in Pinehurst, is the biggest at an estimated $119.7 million. The U.S. 15-501 section runs from U.S. 1 in Aberdeen to Brucewood Road in Southern Pines and is estimated at $61.7 million.
According to The Pilot's report on the DOT's progress, the finished N.C. 5 will include:
So far the work has been preparation: land acquisition, clearing, utility moves and grading. On N.C. 5, crews have been regrading and relocating water and sewer lines. NCDOT engineer Travis Morgan told The Pilot to expect more grading, utility relocation and storm drainage work, with possible nightly lane closures between 8 p.m. and 6 a.m.
NCDOT's posted completion date is fall 2028. The Pilot has linked that target to the U.S. Open and U.S. Women's Open, which Pinehurst hosts back to back in 2029. The money is moving more slowly than the deadline, though. On Nov. 5, 2026, the NCDOT Board of Transportation's project list said construction spending on the N.C. 5 project "has not occurred as quickly as originally anticipated." The board cut that project's fiscal 2027 funding by $5 million and the U.S. 1 project's by $15 million, shifting both amounts to fiscal 2028. If you're buying along N.C. 5 now, expect a construction zone for at least the next two years and a different road layout at the end of it.
The road plan also shapes decisions before anything is built, and Sandhills Station shows how. Habitat for Humanity of the NC Sandhills is planning a mixed-use, mixed-income community there on about 103 acres between U.S. 15-501, Pee Dee Road and Hight Road. On Oct. 26, the Aberdeen Town Board approved a revised plan that removes the residential entrance from U.S. 15-501. Homes will be reached only from Pee Dee Road and Hight Road. According to the Sandhills Sentinel, an internal north-south road will connect Hight Road to Pee Dee Road, and Kimley-Horn traffic engineer Nathan Romberg said talks with NCDOT about highway access were still going on.
That left the commercial frontage on the highway, and the board took up how many driveways it should get. Town Manager Paul Sabiston explained the concern to The Pilot:
"I would hate to see six different driveway permits by six different owners if they're all at different parts on that strip. I don't know that DOT would OK it, but I'm not sure I want to live in the 'What's DOT going to do tomorrow?' world. I'd rather have a shared entrance."
The board limited the commercial parcels to three access points, two on U.S. 15-501 and a secondary one on Hight Road. The Sentinel reported that Mayor Robbie Farrell questioned how many driveways the two-lane highway could take as nearby projects add homes.
The town takes the same approach on N.C. 5. Early in 2026, the board voted 5-0 to apply the NC Highway 5 Priority Corridor Overlay to properties along the highway. Planning Director Pam Graham said its purpose was to preserve the viewshed, improve connectivity and reduce traffic hazards from new entrances onto the highway. The overlay leaves base zoning and allowable uses unchanged, and it applies only to new development or redevelopment. In both cases, Aberdeen is limiting how many ways traffic can get onto the highway more than how many homes go on the land.
The revised plan also changed what kind of housing Sandhills Station will have. The total dropped from 340 homes to 280. The original design's multifamily section, which combined affordable workforce units with units that had no income limits, was replaced by 115 single-family homes to be sold to a market-rate builder. Habitat plans to keep roughly 150 homes as its own builds. Rear alleys became front driveways, a town well site was moved, and the build went from five phases to two. Open space grew from about 23.2 acres to 26.5.
Habitat's stated reasons were market conditions and the loss of development partners. The Pilot also reported the nonprofit's earlier explanation that more apartments and townhomes were going up around the county. A developer that started with a plan anchored by multifamily housing decided Moore County already had enough of it and switched to detached homes. That tells you where builders currently see unmet demand. Habitat bought the land in 2023 after receiving a $3.5 million grant from MacKenzie Scott. The project is estimated at $15 million, with the first phase expected to start in 2028.
On N.C. 5, the newest homes are going up in D.R. Horton's Martin Farms. It covers about 230 acres beside the new Aberdeen Elementary School, has approval from 2020 for 515 homes, and is entered from N.C. 5 by way of Farrell Parkway. That entrance is at the school intersection where NCDOT plans a new signal, so Martin Farms will have a signal at its front door, something many other entrances along the divided stretch won't get.
Within the community, the builder sells four separate product lines. Starting prices as listed on the builder's community pages at the time of writing:
| Product line | Home type | Advertised starting price |
|---|---|---|
| The Townes | Townhome-style | $256,490 |
| Martin Farms | Detached | $326,990 |
| The Villas | One-story | $339,990 |
| The Manors | Detached | From the $399s |
The gap from the townhome line to the Manors is about $140,000, and every home in all four lines uses the same entrance and the same road. Within Martin Farms, price reflects the product type, while location along the corridor is the same for everyone.
Martin Farms isn't the only project here. According to the Sandhills Sentinel, Ribera Development's Ten Pines, approved in November 2025, covers 122.3 acres east of N.C. 5 and south of Olivia Lane, near the Aberdeen–Pinehurst line, Country Club of North Carolina and Jackson Hamlet. It is planned for 305 single-family homes and duplexes, with estimated prices from the high $300,000s to the high $500,000s. Martin Farms and Ten Pines together come to about 820 homes, close to The Pilot's estimate of "more than 800 homes planned for construction along N.C. 5." That growth is part of why Aberdeen's 2026-27 budget includes new water wells and water and sewer line replacements while keeping the property tax rate at 42 cents per $100 of assessed value.
All of the above comes down to a few practical questions about any new-construction home along N.C. 5 or U.S. 15-501:
Is N.C. 5 being widened all the way to Pinehurst? It will be four lanes from Aberdeen, narrowing to three around Linden Road toward the Blake Boulevard intersection in Pinehurst.
Will Sandhills Station homes have a driveway onto U.S. 15-501? No. Residential access in the approved revision is from Pee Dee Road and Hight Road only.
Does the N.C. 5 corridor overlay affect homes and businesses already there? The town applied it to new development and redevelopment, and the base zoning and allowable uses stay the same.
If you're comparing an Aberdeen corridor lot with a resale home elsewhere in the Sandhills, The Gentry Team can go through the NCDOT plans, entrance locations and build timelines with you before you commit. Request a free consultation, and we'll look at how the road outside a particular property is expected to work once the construction is finished.
Stay up to date on the latest real estate trends.
If working with a team that truly gives back to the community matters to you, we would make a great match. Reach out today to get started on buying or selling your home with a team that knows Moore County inside and out. With decades in the industry and an exceptional team of sales specialists, The Gentry Team has sold more homes than any other real estate firm in Moore County—and more than the total volume of most real estate companies in the region. This level of experience is unmatched, allowing us to help you sell your home for top value while anticipating and handling every detail along the way. We work collaboratively, combining our collective expertise to achieve the very best results for our clients. It is an approach built on trust, teamwork, and proven success. When you work with real locals, you get real results.